The Main Complex Building demonstrates an emphasis on employee well-being; a reduction in embodied carbon through the reuse of existing buildings; efficiency of design that prioritizes craft in construction over ornate materials shipped in from afar; and the promotion of an equitable society.
The original site included two buildings that were less than thirty years old. A key design decision was to retain and improve these buildings, a move that would ultimately save years of construction time and around $100 million including the cost of relocating staff while the buildings were replaced.